Project Status
Under Construction
Project ID
234
Project Type
Capital Improvement
Sherwood Pedestrian Bridge

Description

  • HWY 99W PEDESTRIAN BRIDGE PROJECT

Project Name:                       Hwy 99W Pedestrian Bridge Project

Current Phase:                      Construction

Phase Completion Date:     September 2025 

Page Update:                        August 7, 2025

Contact Information:

Email: watersj [at] sherwoodoregon.gov (99wpedestrianbridge@sherwoodoregon.gov)
Phone: 503.625.4264

The Bridge Will Be Open for Use on August 26!

There will be minor ongoing construction until the grand opening celebration
 takes place in late September. Check back for updates. 
 

Project Description

The City of Sherwood is building a better and safer way for people biking and walking to cross Highway 99W: a 900-foot long bicycle and pedestrian bridge over the highway. It is just north of the intersection of Sunset Boulevard/Elwert Road, between the Sherwood Family YMCA and Sherwood High School.  
 

Project Benefits

Safety: eliminate or reduce vehicle/pedestrian conflicts and exposure
Desirability: minimize out of direction travel for pedestrians
Accessibility: provide crossing opportunities for all pedestrians and bicyclists
Connectivity: integrate the crossing with the existing and planned trail network to connect Sherwood across Hwy 99W
Beauty: create an opportunity to welcome individuals to Sherwood through design or lighting features
Efficiency: provide high benefits for the City of Sherwood at a cost commensurate with similar facilities
 

Timeline

Construction began in February 2024 and the bridge will be open to bikes and pedestrians beginning on August 26.  Final landscaping and punch list repairs will be completed prior to the grand opening event, which is tentatively scheduled for late September, 2025.
 

Ribbon Cutting Event Coming in September 

Join us to celebrate the grand opening of the bridge! This community event's date is not yet confirmed, but may take place on September 27, 2025. Check back for details.

 

What's Happening Through August:

  • Preparing and pouring sidewalks on the approach ramps.
  • Wiring and programming the color-changing lighting on the bridge (you may see a preview on certain nights!)
  • Architectural bridge lighting and pedestrian path lighting will begin.
  • Installing pedestrian path light fixtures on the bridge and the approaches.
  • Installing bridge railing, approach ramp railing, and throw barriers.
  • Doing final grading, irrigation, and planting throughout the project area.
  • Removing the construction fences and restoring the site at the YMCA and Elks Lodge staging areas.

 

Watch Videos of the Bridge Installation

Watch these time-lapse videos to see the work in action!

Video of bridge span installation over Highway 99W
Video of bridge span installations over Elwert Road and the greenspace
Video of bridge span installations over Kruger Road and the greenspace

 

Design & Construction Team   

The City of Sherwood is working with these partners on this project:

  • Carter & Co. -- Construction General Contractor
  • KPFF -- Structural & Civil Engineering, Surveying, Project Management, Construction Management
  • DKS -- Traffic & Lightning Engineering
  • GreenWorks -- Landscape Architecture
  • Architectural Applications -- Bridge Architecture
  • Biella Lighting Design
  • JLA Public Involvement -- Community Engagement


     

 

 

 

 

 

 